Passing the LEED AP BD+C certification exam can be challenging, which is why practicing with LEED AP BD+C questions can greatly increase your chances of success. USGBC LEED AP BD+C dumps questions help you become familiar with the exam format. The LEED AP BD+C questions are designed to mimic the actual exam, which means that you'll get a feel for the types of questions you'll encounter, the difficulty level, and the time limit. All the LEED AP BD+C exam dumps questions are the latest version for you to study. Test free LEED AP BD+C exam questions below.

Page 1 of 10

1. Which of the following activities must be prohibited within a building as a prerequisite to LEED certification?

2. A new five-story building with a 30,000 ft2 (2 800 m2) footprint is being designed on a previously disturbed100,000 ft2 (9 290 m2) site. The remaining on-grade surface will be 35,000 ft2 (3 250 m2) of asphalt parking, and 35,000 ft2 (3 250 m2) of native vegetated open space. To achieve a point for exemplary performance under Option 1 of Sustainable Sites Credit, Site Development - Protect or Restore Habitat, the design team will have to incorporate a native and/or adapted vegetated roof with a minimum area of

3. A comprehensive rainwater management plan may include design elements such as

4. For a whole building energy simulation approach, what should be identical for the base building and the proposed building?

5. A project team is deciding on the impact of a proposed concrete walkway.

Which of the following will be impacted as a result of adding the walkway?

6. For a new project with a $10 million construction cost, the weight of the total recycled content is 0.9 tons (816.5 kilograms) each for post-consumer and pre-consumer recycled content. The value of the total recycled content is one million each for post-consumer and pre-consumer recycled content.

What is the percentage of recycled content that contributes toward Materials and Resources Credit: Building Product Disclosure and Optimization - Sourcing of Raw Materials, Option 2, Leadership Extraction Practices?

7. A newly constructed school has installed solar thermal systems and wind turbines on site.

To achieve the maximum number of Energy and Atmosphere points, which team members must be included?

8. The total land area within a 1/4 mi. (0.40 km) radius of a project boundary consists of 130 acres (53 hectares) and has a residential to nonresidential ratio of 60:40. Within this same total land area, there are 780 dwelling units and 1,600,000 ft2 (148 645 m2) of nonresidential building space.

Given these parameters, what are the surrounding residential and nonresidential densities when attempting to achieve Location and Transportation Credit, Surrounding Density and Diverse Uses?

9. What phase of the integrative process gives the team the greatest chance of success in meeting the project's environmental goals cost-effectively?

10. The design team has specified products to achieve Materials and Resources Credit: Building Product Disclosure and Optimization - Sourcing of Raw Materials, Option 2. Leadership Extraction Practices for the project. At the end of the construction, it was discovered that the transporter who shipped a portion of the wood did not have chain-of-custody (CoC) certification.

The design team should do which of the following?


 